Sustainable Design Blog

Construction cost vs Project cost


2012-11-29_11.42.23-resized-600.jpg

Why "construction cost" shouldn't be the only thing on your mind before breaking ground:

So often we are asked, "what is it going to cost me to construct this building?" Or even, “How much per square foot does it cost to build a (fill in the blank) building?” 

I hear it at work, at parties, from friends and family... I get it, and I actually love how much faith you put into our expertise on the subject, and it is something we actually help people with quite regularly. But it's hardly a matter of looking at a picture (or imagining what you describe) and spitting out a figure about how much your project is going to cost.

But that isn't what you were asking to begin with. This is about construction costs, which, by itself is a loaded request - it should be about project costs, because there are so many variables and hidden soft and related costs that you won't come even close to coming in at budget without considering the weight they also carry.

It's the kind of weight that could stop your project dead in its tracks.



Too many construction budgets are formulated using only the “hard construction costs," not considering any of the “soft costs,” setting their maximimum available amount of money at a level well below what will be necessary to complete the project.

When the budget is gone, the construction stops - period. So, here are some of the other costs you need to be thinking about.

 

1. Construction costs

Costs associated with the foundation and the building itself

  • HVAC
  • Plumbing
  • Walls
  • Windows
  • Lumber
  • Hardware (bolts, nails, screws)
  • Concrete
  • Wiring
  • etc

2. Other project costs

Costs associated with financing, permitting, regulatory fees, furnishings, etc. 

  • Land Acquisition: Purchase Price, Financing, Legal fees, titling & documents fees; all costs associated with obtaining the land on which the building will be constructed
  • Site Planning: Soils Reports, Environmental Studies, transportation studies and surveying for utilities, easements, and topography.  It also includes regulatory agency review fees where applicable for the pertinent federal, state, county, and/or city agencies that have jurisdiction over the site design.
  • Professional Fees:  Architect and Civil, Structural, Electrical, Mechanical, Engineers, as well as Landscape Architect, Interior Designer, and other specialty consultants depending on the size and complexity of the project.

  • Fixtures & Furnishings / Equipment: Tables, chairs, and anything that is not built-in or included with the actual construction.  This may also include systems that are being installed by others not included in the building construction such as sound systems, communications and wi-fi technology systems, security systems. Window shades are an item that is often overlooked.

  • Other: Some projects may require additional legal or special accounting professional, fund raising or grant writing consultants and those fees should also be addressed.

3. Taking action

Be prepared to invest and engage in a Project Programming Phase that includes preliminary project budgeting.  A well-defined Project Budget includes all the possible hard and related construction costs and identifies where the funds are coming from.  At Carlson Studio Architecture we have developed some unique comprehensive tools to assist you in developing the sound foundation of a successful construction project.

Project Programming is defining the needs and goals of the facility that is being proposed.  More than just saying a doctor’s office, coffee shop, or charter school, it is a detailed accounting of people using or working in the space, the equipment and/or furnishings, space relationships and more. 




CONCLUSION:

The Project Cost is really the sum of all of the above. Your architect may be able to help you plan for everything, not just the hard costs associated to the materials. We help our clients by developing a Project Budget that includes all the possible project components and allows the owner to identify the source of funding for each.  This way the funding for the entire project is identified early and the problems associated with unidentified costs are minimized.

In the initial budget stage these costs will be non-specific, but they should be defined as such, and always be calculated by erring on the high side.

Interested in a project consultation to see if your building idea is feasible with your current budget? Set up a free consultation today!

Free Consultation



 

Read More

Sun N Fun Lifestyle Wellness Center, new Landmark!

by Harold Bubil
HeraldTribune, Real Estate Editor

Sarasota's newest architectural landmark brings the city's modernist tradition to an unlikely place: a resort and campground.

Recently celebrating 50 years in business, Sun-n-Fun on Fruitville Road, just east of Interstate 75, is known for its collection of mobile homes, recreational vehicles and modest buildings that serve the needs of its clients. Now it has a monumental piece of design — the newly opened, $5.5 million Indoor Pool and Wellness Center, an 18,000-square-foot structure that houses a 25-meter therapy pool, exercise rooms and locker rooms on the west side of the 147-acre campus.

"We wanted the 'wow!' factor," said Tim Deputy, Sun-n-Fun's general manager.

They — Sun-n-Fun management and the facility's owner, Royalty Resorts of England — got it with a gleaming white structure that has walls of glass and a curving roof arching from south to north, and faces the large, 50-year-old outdoor pool.

"It just brings a smile to your face because you know you are in a resort," said Tim Deputy, Sun-n-Fun's general manager. "You are not in a campground, you are in a resort, and I think it makes a quality statement.

"We like to think of ourselves as a leader" in the resort and campground industry, Deputy said. "We knew that by making that statement, it would take us that far ahead ... to what our new guests will appreciate."

It seems to be working...read more

sun n fun
   
Read More

CSA's Lakewood Ranch Plastic Surgery, featured on ABC 7' Green Living Segment

This week reporter Scott Denis from ABC 7 featured the LEED Certified Lakewood Ranch Plastic Surgery Office on his "Green Living" segment.

"A Suncoast doctor wanted his office to be not just a place that promotes health, but a healthy environment as well.  Plastic Surgeon Dr. Joshua Kreithen has accomplished both with one of the first LEED-certified doctor's offices in the state.

You feel relaxed from the moment you walk in. The soothing sounds, attractive building materials and the extensive use of natural lighting..." Click here for the full article

   LEED CI certified
Read More

Carlson Studio Architecture’s Jedd W. Heap Earns Florida License

Carlson Studio Architecture (CSA), a Florida-based sustainable design firm, proudly announces that Jedd W. Heap, AIA, LEED AP BD+C, earned his Architecture License from Florida’s Board of Architecture and Interior Design, as well as the National Council of Architectural Registration Board (NCARB).

Heap, a project manager at CSA since 2007, has more than 13 years of professional design experience. He has managed several LEED-certified projects including the recently completed Cancer Support Community and Lakewood Ranch Plastic Surgery’s new office. He is currently overseeing the construction of his latest design, the LEED-Gold-seeking Sun N Fun Lifestyle Wellness Center.

In 1998 Jedd graduated from the University of Florida with a bachelor’s degree in architectural design and after gaining several years of valued work experience he earned is master’s degree in architecture at the University of South Florida, Tampa. Heap serves on the Manatee County CRA Advisory Board and has served on both the local and state boards of the American Institute of Architects (AIA). In 2009, the Florida AIA awarded Heap the Associate Honor Award.

Jedd W. Heap, AIA, LEED AP
   
Read More